Related Documents. Use of Current Documents. This document is a copyrighted work and may not be reproduced or excerpted from without the express written permission of the AIA. There is no implied permission to reproduce this document, nor does membership in The American Institute of Architects confer any further rights to reproduce this document. The AIA hereby grants the purchaser a limited license to reproduce a maximum of ten copies of a completed G, but only for use in connection with a particular project.

Author:Goltill Molar
Country:Kuwait
Language:English (Spanish)
Genre:Software
Published (Last):11 December 2004
Pages:498
PDF File Size:15.93 Mb
ePub File Size:9.82 Mb
ISBN:954-3-91661-263-1
Downloads:79744
Price:Free* [*Free Regsitration Required]
Uploader:Tekus



AIA Document G— is a standard form for recording the date of substantial completion of the work or a designated portion thereof.

The contractor prepares a list of items to be completed or corrected following substantial completion, and the architect verifies and amends this list. If the architect finds that the work is substantially complete, the form is prepared for acceptance by the contractor and the owner, and the list of items to be completed or corrected is attached.

In G, the parties agree on the time allowed for completion or correction of outstanding items; the date when the owner will occupy the work or designated portion thereof; and a description of responsibilities for maintenance, heat, utilities, and insurance.

Related documents. Changes to the previous edition. G includes a revised information block to identify the Project, Contract, Owner, Architect, Contractor, and information relevant to the Certificate of Substantial Completion. G was reorganized so the Architect can sign the form, and include the date of Substantial Completion, immediately after the description of the Work the Architect is certifying.

Also, the paragraph regarding warranties was updated to clarify that warranties commence on the date of Substantial Completion unless the parties indicate otherwise in this form. Was this helpful?

LS1240 DATASHEET PDF

Summary: G704™–2017, Certificate of Substantial Completion

These documents are designed to be used on a Project where a Contractor has a direct Agreement with the Owner. Use of Current Documents. This document is a copyrighted work and may not be reproduced or excerpted from without the express written permission of the AIA. There is no implied permission to reproduce this document, nor does membership in The American Institute of Architects confer any further rights to reproduce this document.

DEATH AND THE MAIDEN DORFMAN PDF

Instructions: G704™–2017, Certificate of Substantial Completion

AIA Document G— is a standard form for recording the date of substantial completion of the work or a designated portion thereof. The contractor prepares a list of items to be completed or corrected following substantial completion, and the architect verifies and amends this list. If the architect finds that the work is substantially complete, the form is prepared for acceptance by the contractor and the owner, and the list of items to be completed or corrected is attached. In G, the parties agree on the time allowed for completion or correction of outstanding items; the date when the owner will occupy the work or designated portion thereof; and a description of responsibilities for maintenance, heat, utilities, and insurance. Related documents. Changes to the previous edition. G includes a revised information block to identify the Project, Contract, Owner, Architect, Contractor, and information relevant to the Certificate of Substantial Completion.